Friday, June 13, 2008

We're at lock up!

Calendar Day 191 (Working day 116):

We're officially at lock up stage!
Although we can still go in, as the internal access door from the garage hasn't been installed yet (but it's not visible from the street).

The cladding to the front, sides and back of the house were completed (installed and painted).

Aside from this, all external timber doors and windows were stained...

Front facade (stained timber doors/windows):


Cladding to the side of the house painted:


Back cladding installed and painted:


Bi-folds and sliding doors stained:


Notice that the FC (Fibre Cement) Sheets were also installed above the bi-fold and sliding doors and above the family area window: