When we entered and checked the progress, these are what we found:
Water was leaking on the garage ceiling!
This might have happend due to issue of overflashing on the garage roof. Our inspector have raised this, but they haven't fixed the issue. Good thing it rained continuously for 3 consecutive days. The issue was further highlighted.
When we checked the rest of the house, we noticed that they started fixing the other internal issues:
Kitchen window now aligned (look at the gap on the lower left side of the window):
Cladding replaced and aligned:
Leisure area cornice (upstairs) ripped off:
same with the ones in the Ensuite (this is the worst area):
the wall batten lights were also moved to the right location (from top of the mirror to sides):
There are still lots of outstanding issues not yet fixed.
We wonder if the promised handover date on Friday, 19 Dec, would push through.