Saturday, September 20, 2008

Electrical/Plumbing almost finished!

Calendar Day 289 (Working Day 186):

When we visited the house, we saw the tiler cleaning the balcony tiling and 3 plumbers installing the bathroom/toilet fixtures.

Balcony tiling:



Right side:


Middle part:


Garage installed!


and the flourescent light:


Entry hallway (notice the dimmer/lights switch to the right side of the wall):


close-up of the dimmer/lights switch, which should be located inside the HT room:


HT ceiling with dimmable downlights and power outlet for the projector:


Two downlights along the middle part of the entry hallway... how come they are not aligned? We'll be placing a small chandelier to the front entry hallway:


Shelvings to the Laundry's linen closet:


Powder room's mirror and surround tile (no grout yet):


Powder room batten and exhaust (will change to a different light fitting after handover):


As a result of incorrect size of the stone waterfall sides of the kitchen island bench, they ripped off the stone and will be replaced with the correct size:


WIP's shelvings:


Inner right side of the WIP:


Downlights to the Family area:


1st step light to the stairs:


2nd step light:


Upstair's Linen shelvings:


BIR to bed2:


Bathroom shower fittings:


bath tub fittings:


Issue with the bathroom wall's light fittings.. should have been installed to the sides of the mirror and not on top:


Toilet suite (Fowler's Newport):


One of ensuite's vanity:


Ensuite shower - grouting finished (but not yet cleaned):


Same issue with the wall light fittings to the Ensuite.. should have been installed to the sides of the mirror and not on top:


Right side of the master WIR:


We have already emailed our CSR re: the issues on:
- location of wall light fittings to the Bathroom and Ensuite (should be on the sides and not on top of the mirror), as well as the
- location of the dimmer/light switch to HT (should be inside)

Can't wait to get our keys!!!!!!!!!!!

Saturday, September 13, 2008

Tiling almost finished!

Calendar Day 283 (Working Day 181):

We were so lucky today; when we went to visit the house, the tiler was there finishing up the wall and floor tiling to all wet areas!

Not only that, we saw that the stone benchtops were all in!

Let's start from the outside:

Balcony tiles were laid (but no grout yet):





Laundry door painted:


Looking from the Mud Room to the Powder Room:


Powder room with stone benchtop (Mangrove):


Broom and Linen cupboard doors painted:


Sliding doors to Dining and Bi-fold doors to Family were stained:




and... the kitchen benchtops were installed!


but the rear/waterfall sides were the wrong size... should be 100mm and not 40mm!








Close-up shot of pot drawers:


overhead cupboards:


Now, going upstairs, this was the condition of the Master bedroom while the tiler was laying tiles in the Ensuite:


here is the ensuite shower now.. with the niche!




and we have the stone benchtop... again, in Mangrove:


the toilet floor tiles (Chocolate Harmony Porcelain):




The kids' bathroom:


Stone benchtop & surround tiles (to mirror) were intalled:


The tiler said he would finish the tiling on that day. Hope he did!
We're happy with the quality of the laying so far..