Wednesday, December 19, 2007

Let's have a SLAB party!!!

Calendar day 14 (working day 10):


We have a slab!!!!!!



Merry Christmas to everybody!
What a wonderful gift this Christmas!
This will definitely cure during the holiday season!
We were advised that building works will re-commence on the 14th of January next year!




Tuesday, December 18, 2007

Slab preparation (CD13)

Calendar day 13 (working day 9):

We're definitely going to have a slab before Christmas!
What a wonderful gift!

Slab preparation...

garage side...











Monday, December 17, 2007

Slab materials delivered! (CD12)

Calendar day 12 (working day 8):

The slab materials were delivered!!!!!!!!!




Friday, December 14, 2007

Calendar day 9...

Calendar day 9 (work day 7):

Pergola posts to the right (where the inverted 'L' shape trench is)

home theatre to the front right of the house...

garage to the left...




Tuesday, December 11, 2007

Calendar day 6...

Calendar day 6 (working day 4):

Plumbing time...








Monday, December 10, 2007

Calendar day 5...

Calendar day 5 (or Working day 3):




Thursday, December 6, 2007

Today is our site start!

Finally.. our building works commenced today!

Here are some photos of Day 1 building works:

We have a fence now...




and a water tap...





Wednesday, December 5, 2007

We went to the block tonight, after my daughter’s Christmas concert, and saw a bulldozer parked on our block!
That’s a great sign that our builder is ready to commence building tomorrow!

We’re ecstatic!

Wednesday, November 28, 2007

We have a site start! Finally!

We were informed by our CSR that our site start will be on the 6th of December, Thursday.


After two long years of searching for our dream house, moving from one builder to another, and waiting to commence construction, we finally are going to start building next week!


Exciting!!!!!!!!!!!

Wednesday, October 31, 2007

Construction loan fully approved!

We finally received full approval of our construction loan!

Design and colours approved by land developer!

We also received Stockland’s approval of our house design and colour selection today!

Need to inform our builder ASAP about the good news! Next step is the building permit! Yeepee!!!!!!

Saturday, October 6, 2007

Tile selection

Our last appointment has just finished - the tile selection. It was held at the main display centre of Beaumont tiles. Our consultant, Kerin, was very helpful and provided us with lots of ideas and suggestions.


We decided to remove the floor tiling (throughout the house, except for the wet areas) from the plans, as we thought of doing it by ourselves after hand-over.


We upgraded the tiling for the following areas:

  • floors to all wet areas (to 300mm x 300mm harmony choc porcelain tiles)
  • accent tiles to bathroom
  • accent tiles to niche of ensuite shower

Total cost of the upgrades is around $2,000+.
We’ll do our own floor tiles (for the ground floor area) after hand over.

Monday, October 1, 2007

Contract signing!

We signed the contract with Metricon!

It was scheduled at 9am and it took around 3 hours before we finally signed it. We actually wanted to bring the contract home to be able to review it in detail before signing it. Unfortunately though, the contract administrator (RB) told us that we would have to go back again to their office to sign it. As we didn’t want to take another half day off, we decided to review the contract thoroughly and sign it on the same day.

We pointed out the issues that we noticed:
  • increased price on some items
  • incorrect specs
  • some missing items, etc.

RB left us to discuss the issues and finalise any further changes that we want.

Thursday, September 27, 2007

Colour selection

Finally, the much-awaited colour selection is finished! The appointment took place at Studio 501 and lasted for a little over two hours (started at 9am). I guess, because we had done this before (twice actually, with two other builders), we were more prepared and knew exactly what we really wanted.

As expected, lots of things were upgraded, including the following items:

  • kitchen benctops from category 1 to category 2 caesarstone, 40mm and 100mm side panels
  • kitchen cupboard handles
  • category 2 glass splashback
  • colour-through roof tiles
  • category 3 bricks
  • off-white mortar
  • timber-look garage doors
  • Fowler Newport wall faced cube toilet suite
  • Newbury bath tub to ensuite
  • Balmoral doors (high doors to ground floor)
  • Timber doors to home theatre (2 sliding) and pantry (1)
  • acoustic insulation to home theatre
  • evaporative cooling
  • 4-star ducted heating with zoning
  • flyscreens
  • remote controls to garage doors
  • entry door pull handle
  • powder, master, bath and W/C rooms door locks
  • mirrored sliding doors (frame colour: polished silver)
    etc…

Here is our Colour Schedule:

  • bricks - Austral’s Hawthorn
  • mortar - off white
  • mortar joints - flush
  • roof tiles - Boral’s Striata (colour: Charcoal Grey) colour through
  • gutter, fascia and downpipes - Colorbond’s Woodland Grey
  • kitchen benctops - Caesarstone MINK


  • kitchen glass splashback - Bristol “Olive Grey” on Diament glass
  • ensuite/bath/powder benchtops - Caesarstone MANGROVE
  • ensuite bath tub - Newbury


  • powder, WC and ensuite WC toilet suite - Fowler Newport wall faced cube
  • evaporative cooling unit - Charcoal Grey
  • front windows - stained timber
  • side and rear windows - aluminum (colour: Woodland Grey)
  • front garage doors - sectional overhead (Caoba timber-look, Tuscan profile)




  • rear garage doors - roller (colour: Woodland Grey)
  • laundry benchtop - laminate (colour: Green Soapstone; edge type: square edge)




  • kitchen overhead cupboards - Hardform - melamine edge (colour: Pearl Bisque)




  • kitchen pot drawers - Hardform - melamime edge (colour: Shadow)




  • powder/laundry/bath/ensuite cupboards - laminate (colour: Pearl Bisque)
  • kitchen/laundry/powder/bath/ensuite kicker - laminated (colour: Satin Stainless)



  • internal paint colours:
    ceiling: Bristol’s Willow Herb
    wall: Bristol’s Olivine
    timber doors: Sikkens Dark Oak
    external paint colours:
    front door: Sikkens Dark Oak
  • weatherboard/cladding to upper area of house - Bristol’s Cafe Grey
  • verandah beam/Balcony: Bristol’s Cafe Grey

Tuesday, September 18, 2007

Electrical appointment

Our electrical appointment took place at the office of the builder’s electrical consultant - the Lifestyle National - from 2:30pm to 5:00pm. Our consultant Leanne was very helpful.

We upgraded the following items:

- clipsal switches
- downlights to entry - two extra lights to front of house- two step lights to stairs- two extra heating ducts (to bathroom and ensuite)- pre-cabling for home theatre system
- additional TV points (home theatre and leisure upstairs)
- additional power sockets
- three extra lights above kitchen benchtop
We still have to decide on whether to include the security system to the contract.


Thursday, May 24, 2007

We’ve settled the land!

Land settlement time! We finally have a block of land that we can call our own!

Sunday, May 13, 2007

The design requirements

Here are some of the design requirements that we need to adhere to:
  • minimum of 25 (maximum of 40) degree roof pitch
  • for corner lots (like ours) : secondary facade of the house must have a minimum setback of 2.5m from the side road boundary; turn-the-corner feature must be provided either by using a corner turning verandah, a corner feature or element (eg gable) or a staggered setback addressing the corner; and a stagger to the side of the house facing the secondary street
  • at least 20% of the facade is to be rendered or painted
  • mid to dark grey low-profile concrete or slate roof tiles (non-glazed finish)

Sunday, May 6, 2007

Now it’s time to choose the perfect house for the perfect block

Every weekend, we make it a point to visit display homes in different areas of Melbourne. From the Southern area of Melbourne, to the Northern and Western areas, name the builder and display centre, we’ve been there.

By going to different display centres, we were able to gather information as to:

  • what parts of the house do we really need as a growing family
  • what kind of finishes do we like
  • how much would be the cost of upgrading some items
  • which builder offers the best deal in terms of inclusions, best quality for the price, and best customer service

After months of searching, we finally decided to go for a single-storey Hayman 34 of Porter Davis. We put a deposit of $650, which would cover the soil test. It took us months of dealing with the very nice sales consultant of PD. But when we went to our tender appointment, we couldn’t sign the tender. Probably not the right house yet?


Then we saw this very nice house built by Metricon - the Grandview 36. It’s a bigger house than Hayman, and considering the orientation of our block (back is North-facing), we felt that it was a better house for our block. It would be best if we put all bedrooms to the front of the house (Southern area) and all living areas to the back of the house (Northern area). The house was perfect, so we put an initial deposit (again) of $1,000. Unfortunately, the land developer didn’t approve the plans, as it doesn’t address one of the requirements for a corner block - ie stagger to the side of the house facing the secondary street. The builder tried to address the requirement by putting a stagger to the side of the house, but the cost was too much that we decided to cancel the job. So we left…


Found another builder that offers quite affordable and quality double-storey houses. We got interested with AV Jennings’ 335. The house would definitely address all the requirements so we decided to go ahead with the job. We paid another $1,000 (for the 3rd time!) for the soil test. We had major changes to the plans and it took us around four months to realise that there were some parts of the houses that we didn’t like (in particular, the very small home theatre room size). So when we told the sales consultant that we no longer want the house, she offered us another design - the Savoy 36. That was really our 1st choice, but she kept on pushing the 335. Again, we did major changes to the house, as we thought that we won’t be needing any formal areas anyway. It took us almost six months to wait for the final plans and contracts. Unfortunately, the relationship between us, the sales consultant and the contract administrator went sour during the last few weeks leading to the contract signing. This is due to miscommunication between the contract admin and the sales consultant, the increased prices on some items in the contract, and their inability to commit on the building commencement date (which is very important for us, as we were approximately a month away from the agreed commencement date). After so much frustration and anxiety felt, we decided to cancel.


We went back to Metricon, our preferred builder, to look for a double-storey house that would fit our requirements and budget. Finally decided to go for the Nevada 39, one of their signature collection houses.

Sunday, February 25, 2007

We finally bought our first investment - a block of land!

This is the first step of finally having our own house.

We found a nice block of land at Monterey Central, Point Cook. It’s a 667 sqm block, 18m wide, without easements, and near to all amenities. It’s just a few steps away from a new childcare centre, a commercial centre right across the street, a two-minute drive to the Princess freeway and a few metres away from primary and secondary schools.

We put in a deposit of $1,000 on 25-Feb-2006 to hold the block. We need to get our finance approved in order to finalise the sale.