Calendar Day 289 (Working Day 186):
When we visited the house, we saw the tiler cleaning the balcony tiling and 3 plumbers installing the bathroom/toilet fixtures.
Balcony tiling:

Right side:

Middle part:

Garage installed!

and the flourescent light:

Entry hallway (notice the dimmer/lights switch to the right side of the wall):

close-up of the dimmer/lights switch, which should be located inside the HT room:

HT ceiling with dimmable downlights and power outlet for the projector:

Two downlights along the middle part of the entry hallway... how come they are not aligned? We'll be placing a small chandelier to the front entry hallway:

Shelvings to the Laundry's linen closet:

Powder room's mirror and surround tile (no grout yet):

Powder room batten and exhaust (will change to a different light fitting after handover):

As a result of incorrect size of the stone waterfall sides of the kitchen island bench, they ripped off the stone and will be replaced with the correct size:

WIP's shelvings:

Inner right side of the WIP:

Downlights to the Family area:

1st step light to the stairs:

2nd step light:

Upstair's Linen shelvings:

BIR to bed2:

Bathroom shower fittings:

bath tub fittings:

Issue with the bathroom wall's light fittings.. should have been installed to the sides of the mirror and not on top:

Toilet suite (Fowler's Newport):

One of ensuite's vanity:

Ensuite shower - grouting finished (but not yet cleaned):

Same issue with the wall light fittings to the Ensuite.. should have been installed to the sides of the mirror and not on top:

Right side of the master WIR:

We have already emailed our CSR re: the issues on:
- location of wall light fittings to the Bathroom and Ensuite (should be on the sides and not on top of the mirror), as well as the
- location of the dimmer/light switch to HT (should be inside)
Can't wait to get our keys!!!!!!!!!!!