We were so lucky today; when we went to visit the house, the tiler was there finishing up the wall and floor tiling to all wet areas!
Not only that, we saw that the stone benchtops were all in!
Let's start from the outside:
Balcony tiles were laid (but no grout yet):


Laundry door painted:

Looking from the Mud Room to the Powder Room:

Powder room with stone benchtop (Mangrove):

Broom and Linen cupboard doors painted:

Sliding doors to Dining and Bi-fold doors to Family were stained:


and... the kitchen benchtops were installed!

but the rear/waterfall sides were the wrong size... should be 100mm and not 40mm!




Close-up shot of pot drawers:

overhead cupboards:

Now, going upstairs, this was the condition of the Master bedroom while the tiler was laying tiles in the Ensuite:

here is the ensuite shower now.. with the niche!


and we have the stone benchtop... again, in Mangrove:

the toilet floor tiles (Chocolate Harmony Porcelain):


The kids' bathroom:

Stone benchtop & surround tiles (to mirror) were intalled:

The tiler said he would finish the tiling on that day. Hope he did!
We're happy with the quality of the laying so far..

No comments:
Post a Comment