We have upper level cladding!!!!!!!!
front of the house:

and corner-turning side:


there were still some missing bricks near the kitchen window, as the window was changed to a smaller one (good thing SS realised that the window delivered and installed was the wrong size):

We noticed around 4-5 bricks above the front window to the HT were of different colours (a bit peachy.. we reckon they are Cotham):

Electricals were installed:
Meter box is to the side of the HT (but no HT cabling yet):

kitchen area:

bathroom:

and plumbing too:

We've been asking our CSR about our ple-plaster inspection date.. but looks like it won't happen soon.. wonder why. Kev said that pre-plaster inspection should be done as soon as the electricals are installed.