Tuesday, February 12, 2008

We have gutters/fascias and water pipes!

Works resumed today!

After Calendar day 69 (working day 33):

We now have gutters/fascias:
CD69_BD33_120208_ux

and water pipes connected to all wet areas:
CD69_BD33_120208_bx

laundry:
CD69_BD33_120208_fx

upper level ensuite and bathroom:
CD69_BD33_120208_kx

this is where the island bench would be:
CD69_BD33_120208_ix

we have basic (dumb) meter:
CD69_BD33_120208_tx

and have a look at the back of the fascia... i've always thought that the colour of the front and back are the same.. well, they're not:
CD69_BD33_120208_px