Showing posts with label Slab issue. Show all posts
Showing posts with label Slab issue. Show all posts

Friday, February 22, 2008

Slab issues fixed

Calendar day 79 (working day 41):

Our issues with the slab were fixed!

Here are the before and after photos of the slab areas with overhang timber issue:

Right side of the entry door:
before:
CD65_BD31_080208_ex

taken from inside the house:
CD57_BD25_310108_dx

after:

CD79_BD41_220208_gx

CD79_BD41_220208_bx

Right side of the garage (front of mud room):
before:
CD65_BD31_080208_gx

taken from inside the house:
CD63_BD29_060208_tx

after:

CD79_BD41_220208_ix

Right side of the house (front of HT):
before:
CD65_BD31_080208_fx

after:

CD79_BD41_220208_fx

close-up shot:
CD79_BD41_220208_dx