Friday, April 18, 2008

Ground floor had been bricked!

Calendar day 135 (working day 78):



Western side:


Northern and Eastern sides:


Internal garage wall:


Alfreso post:


Bi-folds re-installed:


Kitchen fixed window replaced with a smaller one:


Some issues we saw:

What are these two timber studs (vertical) doing in the kitchen bulkhead?


Jerry noticed the supporting timber to the balcony - he wonder whether attaching only 1/3 of the timber would be enough to provide support to the balcony floor.


This one needs to be fixed... (leisure area upstairs):