Issue with high doors.. but we have 1st floor frames!

Yesterday, our SS called up DH to inform him that the 2340mm high timber glazed doors won't fit in the Home Theatre room. He was suggesting either to change it to the standard-sized 2040mm timber door or change the size of all ground-floor doors to 2040mm to make them uniform.

DH asked our SS to put it in writing.

Today, we received an email from our CSR asking whether we would agree to change the HT door to 2040mm. DH agreed without discussing with me first and without even asking how much will be the credit for the smaller doors.

CSR emailed back with a happy note (because DH agreed to change the HT door) but there was another problem.
Apparently, not only the HT doors will need to be made smaller.. even the pantry doors!
What? DH was furious and suggested that she discuss it with me.

I emailed back and told them that we won't settle for a smaller door.
It was their fault; their design team approved the high doors, so they should fix it.

Even if there were issues, the framers still did their job today.
Here are the photos on
Calendar day 62 (working day 28):

CD62_BD28_310108_jx

the rest of the front timber windows were delivered today:
CD62_BD28_310108_ix

family room area.. aluminum windows ready for installation tomorrow:
CD62_BD28_310108_fx

pantry to the right, fridge space to the left... so what's the problem with putting in a high sliding door to the pantry?
CD62_BD28_310108_cx

lastly, the home theatre opening:
CD62_BD28_310108_bx

We want high doors to ground floor!!!!!!!!!!!
That was in the plans... and contract!

Friday, February 1, 2008

We finally received a response from our CSR.

We learned from her that we have a new site supervisor (SS) and he will call us anytime next week about the issues that we raised.

According to our CSR, our SS has already contacted the concreter about having the slab rectified.

We're hoping to receive a positive outcome next week.

By the way, we dropped by the site today but nothing has changed.

Thursday, January 31, 2008

Framing (CD57)

Calendar day 57 (working day 25):

Our windows were delivered!!!

CD57_BD25_310108_qx

Here are the issues that we have so far (already emailed 'em to our CSR):

Overhanging timber - portico area (taken from inside):
CD57_BD25_310108_dx

Overhanging timber - front right side of the garage:
CD57_BD25_310108_ox

front left side of the garage:
CD57_BD25_310108_nx

... as well as at the back side of the garage:
CD57_BD25_310108_gx

wonder if these would cause an issue:
CD57_BD25_310108_cx

CD57_BD25_310108_mx

Wednesday, January 30, 2008

Framing (CD56)

Calendar day 56 (working day 24):

CD56_BD24_290108_ax

CD56_BD24_290108_b

Our dining area (notice all areas with floor joist above):

CD56_BD24_290108_c

Fridge opening (the one with the temporary bracing) and WIP to the right of it:

CD56_BD24_290108_d

Tuesday, January 29, 2008

Framing (CD55)

Calendar day 55 (working day 23):

Ground floor framing...

CD55_BD39_290108_a

CD55_BD39_290108_b

CD55_BD39_290108_c