Preparation for fixing the overhang issue

The concreter went back today to start fixing the overhang issue:

portico area (one with the biggest overhang):
CD65_BD31_080208_ex


to the left side of the portico (front of mud room):
CD65_BD31_080208_gx

to the right side of the portico (front of Home Theatre room):
CD65_BD31_080208_fx

CD65_BD31_080208_hx

The concreter will come back on Monday to finish it; afterwards, we will inspect it with the site supervisor.

Thursday, February 7, 2008

We have the rest of the windows!

Calendar day 64 (working day 30):

We now have the timber doors and window to the master bedroom:
VCD64_BD30_070208_kx

side of the house facing the secondary street (east-facing):
CD64_BD30_070208_fx

trusses to the alfresco:
VCD64_BD30_070208_gx

west-facing area:
VCD64_BD30_070208_jx

Wednesday, February 6, 2008

We have windows!

We're still awaiting a response from our CSR re: the issue with the high doors.

In the meantime, we are making progres with our framing. We now have windows!

Calendar day 63 (working day 29):

Front door side lights and HT window (we also have a balcony now!):
CD63_BD29_060208_xx

windows to the ensuite:
CD63_BD29_060208_yx

east-facing windows to HT, kitchen and dining areas:
CD63_BD29_060208_ix

mud room window (looks really like a mud room...) :
CD63_BD29_060208_rx

family room:
CD63_BD29_060208_qx

bi-fold doors to family room going to the alfresco area:
CD63_BD29_060208_ox

laundry door frame only:
CD63_BD29_060208_sx

timber window for the upper floor master bedroom:
CD63_BD29_060208_ux

Tuesday, February 5, 2008

Issue with high doors.. but we have 1st floor frames!

Yesterday, our SS called up DH to inform him that the 2340mm high timber glazed doors won't fit in the Home Theatre room. He was suggesting either to change it to the standard-sized 2040mm timber door or change the size of all ground-floor doors to 2040mm to make them uniform.

DH asked our SS to put it in writing.

Today, we received an email from our CSR asking whether we would agree to change the HT door to 2040mm. DH agreed without discussing with me first and without even asking how much will be the credit for the smaller doors.

CSR emailed back with a happy note (because DH agreed to change the HT door) but there was another problem.
Apparently, not only the HT doors will need to be made smaller.. even the pantry doors!
What? DH was furious and suggested that she discuss it with me.

I emailed back and told them that we won't settle for a smaller door.
It was their fault; their design team approved the high doors, so they should fix it.

Even if there were issues, the framers still did their job today.
Here are the photos on
Calendar day 62 (working day 28):

CD62_BD28_310108_jx

the rest of the front timber windows were delivered today:
CD62_BD28_310108_ix

family room area.. aluminum windows ready for installation tomorrow:
CD62_BD28_310108_fx

pantry to the right, fridge space to the left... so what's the problem with putting in a high sliding door to the pantry?
CD62_BD28_310108_cx

lastly, the home theatre opening:
CD62_BD28_310108_bx

We want high doors to ground floor!!!!!!!!!!!
That was in the plans... and contract!

Friday, February 1, 2008

We finally received a response from our CSR.

We learned from her that we have a new site supervisor (SS) and he will call us anytime next week about the issues that we raised.

According to our CSR, our SS has already contacted the concreter about having the slab rectified.

We're hoping to receive a positive outcome next week.

By the way, we dropped by the site today but nothing has changed.